Gansu Hongfeng Machinery Co., Ltd. is located in Pingliang City, Gansu Province, an important town in the center of the ancient Silk Road and Shaanxi, Gansu and Ningxia, and is a high-tech enterprise restructured and reorganized by the state-owned 920 Factory, a large-scale second-class military enterprise, and a backbone enterprise of strategic emerging industries in Gansu Province.
In the course of specializing in the production of energy-saving products and energy-saving devices such as traps and condensate recovery devices, "Hongfeng" takes the revitalization of the national equipment manufacturing industry and the creation of a national brand of traps as its own responsibility, closely tracks the development trends of science and technology and production trends, adheres to the technological innovation strategy of "no one has me, no one has me, no one has me, and I am new", and has realized the transformation from technology introduction, reference and absorption to independent innovation and independent development.
Based on the strict requirements of the steam system for the reliability, stability, durability and safety of pump and valve equipment, the company has established a complete set of quality assurance and control systems including procurement management, production control, performance verification, quality inspection, after-sales service, etc., and wholeheartedly escorts high-quality products.
We always respect and love our customers, and regard them as friends and siblings, and dedicate perfect services with a grateful heart, because customers are the pillar and source of our career success.
Connection: butt welding, flange
Nominal pressure Class: 900 1500 2500
Pressure difference range bar: 2 to 120 2 to 100 2 to 140
PMA/TMA bar/℃ : 120.7/350 100.4/400 153.7/538
Shell material: F11/A105/F22
2. The valve is always in a water seal state to effectively prevent steam leakage.
3. The float is resistant to water shock, and the unique design on the top of the bucket can effectively prevent the phenomenon of steam lock and air blockage.
4.Can withstand high back pressure (up to 90%).
5. Vertical installation, built-in check valve has a slight impact on displacement.
Application: High pressure, large amount of condensate flow equipment.
Installation instructions:
Provide adequate diameter and length (700~1000) of the collection pipe, trap installed below the main water valve and or inlet pipe do not keep warm.